Sixth Avenue, Flixborough Industrial Estate, Scunthorpe DN15 8SH01724 282 937  |  info@simon-engineering.co.uk
Call 01724 282 937
A 150,000 litre blue bunded fuel tank outside the Simon Engineering workshop

Fuel tanks built to fit your site.

Integrally bunded steel tanks from 1,000 to 150,000 litres for diesel, HVO, gas oil, heating oil and AdBlue®. Made in our own workshops at Flixborough, Scunthorpe.

1,000 to 150,000 LTank capacities
110%Bund capacity on every tank
ISO 9001:2015Accredited quality system
30+ yearsMaking fuel storage tanks
SPEC YOUR TANK

Choose the size, colour and cabinet. See it as you go.

Every Simon Engineering tank is made to order. Use this to describe what you need, then send it to us and we will come back with a working drawing and a price.

Capacity40,000 L
1,000 L150,000 L
Liquid
Finish
Any RAL number can be matched to your corporate colours. Screen colours are indicative.
Compartments
1
Security cabinet
YOUR SPECIFICATION

Send this spec to Simon Engineering
HOW BUNDING WORKS

A tank inside a tank, so a leak stays contained.

The inner tank stores your fuel. The outer tank forms a totally enclosed bund with a capacity of 110% of the inner tank contents, so a spill has nowhere to go but the bund.

  • Built generally to BS799-5:2010 (Type J)
  • Follows the Environment Agency and Defra oil storage regulations for businesses
  • Air tested before it leaves us, with an inspection report for every tank
Read the standards
INNER TANK OUTER SKIN FORMS THE BUND: 110%

Press the button to see what a split in the inner tank does.

Green tank with the cabinet door open
MADE IN FLIXBOROUGH

Two workshops, overhead cranes and a team that has built tanks for decades.

Simon Engineering is a privately owned company with over 100 years of combined experience in storage tank manufacture. We keep investing in technology, training and people, and it shows in the quality of the finished tank.

2fabrication workshops with overhead cranes
100+years of combined team experience
70,000 Land under delivered anywhere in the UK by HIAB
About Simon Engineering
FROM ENQUIRY TO SITE

How your tank gets made.

  1. Working drawing

    You approve a drawing before we cut any steel.

  2. Fabrication

    Certified S275 JR steel, internally braced and fully welded by qualified welders and platers.

  3. Testing

    An air test checks for leaks, and an inspection report is signed off at each stage.

  4. Finish and delivery

    Zinc phosphate primer, gloss enamel top coat, then delivery to site.

Tell us what you need to store.

Ask for a quote